Collins (Contractors) Limited

Member

Jack Blake

ADDRESS
Access House, Cray Avenue, Orpington, Kent, BR5 3QB, United Kingdom
TELEPHONE
020 8690 0077
Example of work 1
CONTRACT: 6 Denning Close, London CLIENT: McDonald Architects VALUE: £370,000 Description: We were appointed to carry out the following works to this private residential property situated in St. John’s Wood. • Complete strip out of the existing property • Building of a new side extension • Redesign of the existing roof • Remodel of the internal layout • Bespoke windows • New heating system • Full electrical installation • New bathrooms & kitchen • High quality redecoration throughout
Example of work 2
CONTRACT: Tower Bridge Wharf CLIENT: Earl Kendrick VALUE: £2M Description: Tower Bridge Wharf is a prestigious River Thames fronted large residential complex located just a stone’s throw away from St Katharine’s Docks Marina and Tower Bridge. Within a few minutes walk of Tower Hill and Tower Gateway stations, the property is well positioned for access into the West End, City or Canary Wharf. Works included: Scaffold erection to all elevations Windows /doors / rain screen cladding replacement Repairs and maintenance to masonry elevations Balcony replacements and repairs Replacement of all gutters & rainwater pipework Redecoration work to all previously painted surfaces (Dacrylate Paint)
Example of work 3
CONTRACT: 3 St James Square CLIENT: Lodha Developers UK Ltd VALUE: 460k Description: 3 St James’s Square combines a stunning historic Portland stone façade with elegant contemporary interiors. The property is located on the North East of the Square close to the junctions of Charles II Street and Duke of York Street, the property boasts a prestigious and sought after address. Collins completed the Full CAT A refurbishment to the first and second floors that were the UK headquarters of Lodha Developers UK Ltd. Each floor measures 5100 sq ft. This space had been completely transformed by Lodha into a show apartment to showcase their current development in Grosvenor Square. Both floors had been fully developed to an exceptionally high standard to replicate the style and finishes that would be achieved at the Grosvenor Square project. The works undertaken included the full strip out of all tenant alterations back to base build in accordance with the original lease plan. Upon completion of the strip out works, a full CAT A refurbishment was required which included the following; reconfiguration of mechanical and electrical works including; replacement lighting, replacement air conditioning and associated repairs. Replacement suspended ceilings and raised access floor with full redecoration of all previously painted surfaces.